This tank destroyer project was developed on the basis of the Centurion Mk3 tank in the early 1950s. The vehicle was initially tested with a mechanized ammo rack. However, the ammo rack did not fit the turret, and it was canceled. One prototype was manufactured and underwent trials, but the vehicle never entered mass production.
Marks of Excellence requirements for FV4005 Stage II: beta